
Demolition contractors who handle the asbestos too
Interior strip-outs, full building demolition and deconstruction across Auckland and the North Island - surveyed, licensed and cleared by one crew, so an asbestos find never stops your programme.
- Class A & B asbestos licensed
- Demolition survey included
- Recycling-first disposal
Demolition services
Strip-out, full demolition or careful deconstruction - surveyed, licensed and cleared by the same SES crew.
-
SES Demolition
Interior soft-strip
Fit-out removal, ceilings, partitions, services and finishes taken back to the shell - in occupied buildings if needed. Find out more -
SES Demolition
Building demolition
Full structural demolition of houses, commercial and industrial buildings, including foundations and site clearance. Find out more -
SES Demolition
Deconstruction & recycling
Careful dismantling to salvage timber, steel, fixtures and concrete - diverting most of the building from landfill. Find out more
How a demolition job runs
- Step 01
Site visit and demolition survey
We walk the building, confirm access, services and neighbours, and complete the asbestos demolition survey the Regulations require.
- Step 02
Fixed quote, method and consents
One price covering demolition, asbestos, disposal and clearance, plus the methodology, traffic and dust management plans your consent or client needs.
- Step 03
Asbestos first, then demolition
Licensed removal and clearance before machines start. Services disconnected, site fenced, dust suppressed.
- Step 04
Clear site, documented
Material sorted for recycling, hardfill removed or retained, site left level with disposal and recycling dockets in your completion pack.

What affects the cost of demolition
A standard house demolition in Auckland typically runs NZD 20,000-45,000 including asbestos removal and site clearance; commercial and industrial buildings are priced on structure, height, access and material volume.
The biggest variables are asbestos content, distance to disposal, foundations and whether neighbouring structures need protection. Every SES quote is fixed.

Why builders, developers and facilities managers use SES
Demolition sits inside the same group as our asbestos, specialist cleaning and property maintenance divisions, so the whole job - from survey to make-good - runs on one contract with one supervisor.
- No second contractor for asbestos - Class A and B licences in-house means an unexpected find is a same-day method change, not a two-week delay.
- Live and sensitive sites - hospitals, defence facilities and occupied commercial buildings, with staged works and out-of-hours shifts.
- Recycling-first - concrete, steel, timber and metals separated on site; landfill is the last option, not the default.
- Make-good on the same contract - through SES Specialist Cleaning and SES Property Maintenance if the lease or client requires it.
Demolition across Auckland, Waikato, Northland, Hawke’s Bay and Wellington
Auckland-based plant and crews, with regular projects in Hamilton and the Waikato, Whangarei, Napier-Hastings and Wellington.
Demolition FAQs
Straight answers to the questions procurement teams, facilities managers and property owners ask us most. If yours is not here, call the office or send us the scope and a division lead will answer it directly.
Do I need a consent to demolish?
Most full demolitions need a building consent and, in some zones, resource consent; interior soft-strip usually does not. We tell you at quote stage and can lodge the application.
Do you need an asbestos survey before demolition?
Yes - a demolition survey is required for any building built before 2000. SES carries it out as part of the job.
How long does a house demolition take?
Asbestos removal one to three days, demolition and clearance two to four days. Consents and service disconnections drive the overall timeline.
What happens to the material?
Concrete and brick are crushed for hardfill, steel and metals recycled, clean timber salvaged or chipped. Only contaminated or mixed waste goes to landfill.
Can you disconnect power, water and gas?
We coordinate disconnections with the utility providers before work starts and include them in the programme.
Tell us about the building
Address, photos and what you want left on site - the demolition lead will come back within one business day with a fixed price or a site-visit time.

